Aircraft maintenance

Contact

Are you interested in the service?

If you are interested, click on the button and we will contact you to provide you with all our advice.

Aircraft maintenance

The Maintenance Service (SEMAN), is an Air Force Maintenance Organization of Peru, Approved by OMA No. 180 and authorized by the General Directorate of Civil Aviation (DGAC), by Directorial Resolution No. 011-2013-NTC, in accordance with what is regulated by the Civil Aviation Directorate of Peru, which includes developing research projects associated with its technical-functional field and contributing to the socio-economic development of the country. SEMAN is currently carrying out maintenance work on the Boeing 767-200/300, B-737-200/ 300/400/500, B-727, DC-10, L-382, R172H / 172G and PA- 34-200T aircraft of national and foreign companies, counting for this purpose with authorizations issued by the General Directorate of Civil Aviation and the FAA respectively.

TECHNICAL SUPPORT:

The Maintenance Service to be able to fulfill the works authorized to be carried out by the Aeronautical Authorities requires having the four basic pillars that constitute every maintenance organization:

  • Personnel
  • Infrastructure
  • Manuals
  • Special tools

The Maintenance Service (SEMAN) has highly trained and qualified personnel by the General Directorate of Civil Aviation-DGAC to perform inspection and maintenance of client aircraft, being one of the best OMA in the region. The Commercial Aircraft Maintenance Program performs the following services:

  • RECEPTION
  • INCOMING RUN UP
  • INCOMING AVIONICS SYSTEMS CHECKS
  • INCOMING OPERATIONAL & FUNTIONAL CHECKS (ALL SYSTEMS)
  • PRELIMINARY INSPECTION
  • WASHING AND CLEANING
  • DEFUELING
  • FUEL TANKS OPENING
  • SUBMITTING REQUIREMENTS TO OWNER
  • AD’S/SB’S/MODIFICATIONS
  • CPCP/TASK CARDS
  • PASSENGER CABIN/MAIN CARGO HANDLING SYSTEM (CLEANING/INSPECTION/INSTALLATION)
  • NON-ROUTINE REPAIRS
  • HARD TIME REPLACEMENT
  • A/C PAINTING
  • ACCESS PANELS AND FLOOR PANELS CLOSING
  • REFUELING
  • FINAL AVIONICS SYSTEMS CHECKS
  • FINAL OPERATIONAL & FUNTIONAL CHECKS (ALL SYSTEMS)
  • WEIGHT & BALANCE
  • FINAL RUN UP
  • PAPERWORK REVIEWING
  • DEPARTURE
  • INSPECTION AND MAINTENANCE 25, 50 Y 100 HOURS